Product Description


Installation Video

Technical Specifications

Technical ParameterValue
Model6/4D-G
Flow rate260 m³/h
Head26 m
Speed980 r/min
Power37 kW
SeriesD-G mortar pump (clamp band type)

Installation & Maintenance Notes

  1. 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
  2. 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
  3. 3 Keep a 2–3 mm clearance at the coupling.
  4. 4 Grease the bearings regularly every shift.

Parts Gallery

Click an image to view full size