Product Description








Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Related Products
Trenchless Pipe-Jacking & Shield Accessories
Complete accessory package for trenchless pipe jacking and shield tunnelling: motors, cables, distribution cabinets, couplings, slurry hose, UHMWPE wear-resistant pipe, check valves, shaft-port sealing rings (Φ500–Φ3500), clamps, duckbill valves and more.
Floating Discharge Hose
The working state does not rely on other objects to support the two parts floating to the surface, with a low center of gravity, good stability, corrosion resistance, collision resistance, and bending resistance. It is suitable for operation in high surge areas and narrow waters, and has a long service life. In recent years, this product has developed rapidly and is gradually becoming the protagonist of dredging pipelines. Our company can provide users with various specifications of floating mud discharge hoses
Non-Floating Discharge Hose
Installed between steel pipes in the mud pipeline to increase pipeline flexibility and flexibility
Suction Dredging Hose
Installed between the mud pump and the reamer on the dredger, it can withstand negative working pressure and absorb sediment