製品データ

04.09涡流泵处理后1480.jpg


Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift. This pump has the advantages of long service life, simple structure, and reliable performance. The sealing type is oil seal type, and the overcurrent components have two types: ordinary wear-resistant and high wear-resistant. Note: Two leaves with a particle size of 80 millimeters.




Technical Specifications

技術パラメータ モデル 流量 大揚程 転数 効率 150BS-35-30 300 m³/h 22 m 980 r/min 30 kW 150BS-45-45 300 m³/h 26 m 980 r/min 45 kW 150BS-50-55 300 m³/h 28 m 980 r/min 55 kW

Installation & Maintenance Notes

  1. 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
  2. 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
  3. 3 Keep a 2–3 mm clearance at the coupling.
  4. 4 Grease the bearings regularly every shift.