Product Description

Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Related Products
50ZJE-330 Filter Press Feed Pump
65ZJE-340 Filter Press Feed Pump
Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift.
SYA Filter Press Feed Pump
ZJW-II Series Filter Press Feed Pump
Characteristics: 1 Innovative hydraulic and structural design, high efficiency, anti-wear and corrosion resistance, stable and reliable operation; two The initial feed flow rate is high and the pressure is low; three The later pressing flow is small and the pressure is high; four The shaft seal is simple and reliable, without water injection or mechanical sealing, and has no leakage; five Filter feeding does not require variable frequency speed regulation, resulting in high conveying concentration.