Description du produit

河南非漂浮排泥胶管

Installed between steel pipes in the mud pipeline to increase pipeline flexibility and flexibility.

河南非漂浮排泥胶管



Installation & Maintenance Notes

  1. 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
  2. 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
  3. 3 Keep a 2–3 mm clearance at the coupling.
  4. 4 Grease the bearings regularly every shift.