Description du produit
Complete trenchless pipe-jacking and shield tunnelling accessory package, supplied together with our pump sets:
- Electric motors, cables and distribution cabinets
- Couplings and belt pulleys
- Slurry hose, clean-water hose and fabric-reinforced hose
- Mixing tanks and agitators
- Acid-resistant wire-braided rubber hose
- UHMWPE ultra-wear-resistant pipe and galvanised pipe
- Check valves (one-way valves)
- Shaft-port sealing rings (Φ500 – Φ3500)
- Clamps and pipe connectors (2" – 6" and 3/4" – 6")
- Duckbill valves
- Steel pipe, welded spiral pipe Φ373 / Φ377 / Φ580 and lined steel pipe
Shaft-port sealing ring (standard)
| Specification | Inner dia. (mm) | Outer dia. (mm) | Thickness (mm) |
|---|---|---|---|
| Φ500 | 500 | 1100 | 20 |
| Φ600 | 600 | 1200 | 20 |
| Φ800 | 800 | 1460 | 20 |
| Φ1000 | 1000 | 1700 | 20 |
| Φ1200 | 1200 | 1920 | 20 |
| Φ1350 | 1350 | 2120 | 20 |
| Φ1400 | 1400 | 2180 | 20 |
| Φ1500 | 1500 | 2300 | 20 |
| Φ1600 | 1600 | 2420 | 20 |
| Φ1800 | 1800 | 2500 | 20 |
| Φ2000 | 2000 | 2700 | 20 |
| Φ2200 | 2200 | 2900 | 20 |
| Φ2400 | 2400 | 3180 | 20 |
| Φ2600 | 2600 | 3380 | 20 |
| Φ2800 | 2800 | 3620 | 20 |
| Φ3000 | 3000 | 3860 | 20 |
| Φ3500 | 3500 | 4300 | 20 |
Technical Specifications
Complete package d'accessoires pour le forage sans tranchée et le tunnelier, fourni avec nos ensembles de pompes :Moteurs électriques, câbles et armoires de distributionAccouplements et poulies à courroieTuyaux à boue, tuyaux à eau propre et tuyaux renforcés de tissuBassins de mélange et agitateursTuyaux en caoutchouc résistant aux acides avec armature en filTuyaux ultra-résistants à l'usure en UHMWPE et tuyaux galvanisésVannes de contrôle (vannes unidirectionnelles)Joints d'étanchéité axe-porte (Φ500 – Φ3500)Étriers et raccords de tuyaux (2" – 6" et 3/4" – 6")Vannes en forme de canardTuyaux en acier, tuyaux soudés en spirale Φ373 / Φ377 / Φ580 et tuyaux en acier revêtusJoints d'étanchéité axe-porte (standard)SpécificationsDiamètre intérieur (mm)Diamètre extérieur (mm)Épaisseur (mm)Φ500500110020Φ600600120020Φ800800146020Φ10001000170020Φ12001200192020Φ13501350212020Φ14001400218020Φ15001500230020Φ16001600242020Φ18001800250020Φ20002000270020Φ22002200290020Φ24002400318020Φ26002600338020Φ28002800362020Φ30003000386020Φ35003500430020
Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Produits associés
Tuyau de décharge flottant
L'état de fonctionnement ne dépend pas d'autres objets pour soutenir les deux parties flottantes à la surface, avec un centre de gravité bas, une bonne stabilité, une résistance à la corrosion, aux chocs et à la flexion. Il est adapté à une utilisation dans des zones à forte houle et des eaux étroites, et a une longue durée de vie. Ces dernières années, ce produit a connu un développement rapide et devient progressivement le protagoniste des pipelines de dragage. Notre entreprise peut fournir aux utilisateurs diverses spécifications de tuyaux de vidange de boue flottants.
Tuyau de décharge non flottant
Installé entre les tuyaux en acier dans la conduite de boue pour augmenter la flexibilité et la mobilité du pipeline
Tuyau d'aspiration pour dragage
Installé entre la pompe à boue et le trempoir sur le dragueur, il peut résister à la pression de travail négative et absorber les sédiments