A batch of G and GH series gravel pumps has been tested and dispatched to a customer in West Africa, where they will handle river sand extraction and mine tailings transfer.
Each unit was hydro-tested before packing, and a two-year stock of wear parts — impellers, casings and liners — was shipped together with the pumps to minimise downtime on site.