Descripción del producto

Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift.
Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Productos relacionados
50ZJE-330 Bomba de alimentación para prensa de filtros
Pump de alimentación para prensa de filtros SYA
Bomba Especial para Presa de Filtros
Serie ZJW-II Bomba de alimentación para prensa de filtros
Características: 1 Diseño hidráulico y estructural innovador, alta eficiencia, resistencia al desgaste y corrosión, operación estable y confiable; dos El flujo de alimentación inicial es alto y la presión es baja; tres El flujo de prensado posterior es pequeño y la presión es alta; cuatro El sello del eje es simple y confiable, sin inyección de agua ni sellado mecánico, y no presenta fugas; cinco La alimentación del filtro no requiere regulación de velocidad por frecuencia variable, lo que resulta en una alta concentración de transporte.