Descrição do Produto

Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift.
Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Produtos Relacionados
50ZJE-330 Bomba de alimentação para prensa de filtros
Sonda SYA de alimentação para prensa de filtros
Bomba dedicada para prensa de filtros
Série ZJW-II Bomba de Alimentação para Pressa de Filtro
Características: 1 Design hidráulico e estrutural inovador, alta eficiência, resistência ao desgaste e corrosão, operação estável e confiável; dois O fluxo inicial de alimentação é alto e a pressão é baixa; três O fluxo de prensagem posterior é pequeno e a pressão é alta; quatro O selo do eixo é simples e confiável, sem injeção de água ou vedação mecânica e sem vazamento; cinco A alimentação do filtro não requer regulagem de velocidade por frequência variável, resultando em alta concentração de transporte.