Produktbeschreibung

Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift. Note: With a particle size of 84 millimeters and an outlet diameter of 100-150 millimeters.
Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Verwandte Produkte
6/4D-G Geröllpumpe
Achtung: Diese Pumpe eignet sich zum Entnehmen verschiedener Arten von gelbem Sand, mineralischem Sand sowie zum Transport von Tailings-Schlamm, Tailings-Bergbau, Schlamm, Schlacke, elektrostatischem Flugasche und anderen stark korrosiven Medien in industriellen und bergmännischen Unternehmen. Sie zeichnet sich durch hohe Effizienz, Energieeinsparung, Verschleißfestigkeit, Korrosionsbeständigkeit, zuverlässigen Betrieb, hohe Förderhöhe, großen Durchfluss, lange Transportwege und breite Anwendbarkeit aus. Hinweis: Partikelgröße von 84 mm und Ausgangsdurchmesser von 100-150 mm.
G/GH-Serie Hochleistungs-Schifffahrts-Sandpumpe
G/GH-Serie Schotterpumpe