Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift. Note: With a particle size of 84 millimeters and an outlet diameter of 100-150 millimeters.
Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Produits associés
6/4D-G Pompe à gravier
Pompe industrielle (pompe à boue, pompe à gravier, pompe à boue de sable, pompe à dragage, pompe d'alimentation pour presse à filtre, pompe d'accompagnement pour canalisation sous-terrain, etc.). Cette pompe est adaptée à l'extraction de divers types de sable jaune, sable minéral et au transport de boues de résidus, minerai de résidus, boues, scories, cendres volantes électriques et autres milieux hautement corrosifs dans les entreprises industrielles et minières. Elle se caractérise par son efficacité élevée, son économie d'énergie, sa résistance à l'usure, sa résistance à la corrosion, son fonctionnement fiable, sa haute hauteur manométrique, son débit élevé, sa longue distance de transport et sa large applicabilité. Remarque : Taille de particule de 84 mm et diamètre de sortie de 100-150 mm.
Série G/GH Pompes à gravier marines haute capacité
Pompe à gravier de la série G/GH