Descripción del producto

Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift. Note: With a particle size of 84 millimeters and an outlet diameter of 100-150 millimeters.
Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Productos relacionados
6/4D-G Bomba de Grava
Atención: Esta bomba es adecuada para extraer diversos tipos de arena amarilla, arena mineral y transportar lodos de relaves, mineral de relaves, lodos, escoria, cenizas volantes eléctricas y otros medios altamente corrosivos en empresas industriales y mineras. Posee características de alta eficiencia, ahorro de energía, resistencia al desgaste, resistencia a la corrosión, funcionamiento confiable, alto caudal, gran caudal, larga distancia de transporte y amplia aplicabilidad. Nota: Con un tamaño de partícula de 84 milímetros y un diámetro de salida de 100-150 milímetros.
Serie G/GH Bomba de Grava Marina de Alta Capacidad
Serie G/GH de Bomba de Grava