Descrição do Produto

Attention: 1. Before starting up, test the motor rotation direction, which should be consistent with the pump rotation direction before starting up. 2. Rotate the pump manually for one week before each start-up, and only start when there is no jamming or grinding. 3. Leave a gap of 2-3 millimeters between the couplings. 4. Add butter on time for each shift. Note: With a particle size of 84 millimeters and an outlet diameter of 100-150 millimeters.
Installation & Maintenance Notes
- 1 Before first start-up, check the motor rotation direction and make sure it matches the pump direction.
- 2 Every time before starting, turn the shaft by hand through one full revolution — it must turn freely without jamming or rubbing.
- 3 Keep a 2–3 mm clearance at the coupling.
- 4 Grease the bearings regularly every shift.
Produtos Relacionados
6/4D-G Bomba de Pedregulho
Atenção: Esta bomba é adequada para extrair diversos tipos de areia amarela, areia mineral e transportar lama de rejeitos, minério de rejeitos, lama, escória, cinzas volantes elétricas e outros meios altamente corrosivos em empresas industriais e mineradoras. Possui características de alta eficiência, economia de energia, resistência ao desgaste, resistência à corrosão, operação confiável, alta pressão, grande vazão, longa distância de transporte e ampla aplicabilidade. Nota: Com tamanho de partícula de 84 milímetros e diâmetro de saída de 100-150 milímetros.
Série G/GH Bomba de Areia Marítima de Alta Capacidade
Série G/GH Bomba de Pedras